QUALITY CONTROLLER
Absal Paul Contracting
Posted 30+ days ago
Send me Jobs like this
Nationality
Any Nationality
Gender
Not Mentioned
Vacancy
1 Vacancy
Job Description
Roles & Responsibilities
JOB RESPONSIBILITIES
- Once the project file received from the coordinator the Quality Controller shall study the project details and gives ideas and concepts on upcoming operation processes.
- When the site measurements received the QC should compare them with tender drawings details and inform the coordinator with any irregularity.
- Review the shop drawing in terms of dimensions, conformity to actual details, buildability, materials selections, quantity, installation details or any other information may have influence on the processes to avoid any mistake prior to production processes initiation. Fill the form No.1 and No.1a carefully.
- After reviewing the shop drawings send the form No.1 along with the drawings to the production manager to start fabrication and send a copy of the form to the coordinator to document it.
- When fabrication starts, monitor the production processes step by step till the end to ensure that all details and requirements are fulfilled. Form No.2 has to be filled before sending the product for painting and the product should be stamped to give it a permission to start with painting. Besides the quality ensure that the quantity is correct as well.
- When painting process starts the product should be monitored along the way to ensure that:
- Painting materials in use are as per required specifications.
- Painting processes are carried out in accordance with the same procedure followed to achieve the approved sample. Form No.3
- All parts of same finishing are performed by same mixture and same shine on same time and by same painter (if possible) to achieve the required harmony.
- The finishing is matching the approved sample. The conformity should be verified using big sample not less than 60 60 cm.
- If the job is done perfectly then the product will be stamped to indicate the end of production. Fill Form No.3 sign it and send it to the coordinator.
- When the painting process is over, inform the production controller to deliver the finished products after packing them which should be monitored as well.
- Visit the site to monitor the installation processes till the end. Form No.4
- After works at site finish visit the site with accompany of the factory manager or production manager to prepare punch list as per Form No.5 and submit it to the project manager to carry out correcting actions before inviting the client to receive the finished works. Visit the site again to ensure that all recorded remarks in the punch list are completed.
Company Industry
- Construction
- Civil Engineering
Department / Functional Area
- Quality
- Testing
- QA
- QC
- Inspector
Keywords
- QUALITY CONTROLLER
Disclaimer: Naukrigulf.com is only a platform to bring jobseekers & employers together. Applicants are advised to research the bonafides of the prospective employer independently. We do NOT endorse any requests for money payments and strictly advice against sharing personal or bank related information. We also recommend you visit Security Advice for more information. If you suspect any fraud or malpractice, email us at abuse@naukrigulf.com
Absal Paul Contracting
https://www.absalpaul.com/jobs/quality-controller-joinery-division
Similar Jobs
QA QC Supervisor
Confidential Company
- 8 - 14 Years
- Jubail , Dammam/Khobar/Eastern Province - Saudi Arabia
Quality Analyst
Confidential Company
- 5 - 8 Years
- Riyadh - Saudi Arabia
Inspector Engineering
Confidential Company
- 6 - 12 Years
- Jubail - Saudi Arabia